System Design and Integration, lesson 6 of 12

Drawings: plans, risers and schedules

A design that lives in your head cannot be priced, built or checked by anyone else. Drawings are how it leaves your head. This lesson explains the three documents that carry almost every security design, what belongs on each, and the habits that stop them from contradicting one another.

About 14 minutes. Read lesson 2, The site survey, and lesson 5, Integration, first.

One device, three documents

Pick a device and find it on the plan, on the riser and in the schedule.

Floor plan1/8 in = 1 ft office equip. lobby N D-101 D-102 C-01 ACP-1 Riser diagramnot to scale AANN ACP-1controller SW-1net switch D-101 D-102 C-01 A = door cable, N = network Scheduleone row each TagLocationCblFeet D-101Front doorA110 D-102Equip. roomA25 C-01LobbyN60 ACP-1Equip. roomN10 more columns in a real one: lock, hand, mount height, lens, switch port, notes
The plan says where

The riser says how it connects

The schedule says what

The everyday picture

A box of flat-pack furniture comes with three things. There is a picture of the finished wardrobe, so you know what goes where. There is a diagram of how the panels join, with no attempt to show their true size. And there is a parts list: 16 of screw A, 8 of dowel B.

You need all three, and each answers a different question. Nobody tries to count screws from the picture, or to find out where the door goes from the parts list.

A security design has the same three documents. The floor plan is the picture. The riser diagram shows how things join. The schedule is the parts list with every detail.

What is in a drawing set

DocumentThe question it answersDrawn to scale?
Cover sheet with legendWhat does each symbol and abbreviation mean? Which sheets exist?No
Floor planWhere is each device, and which way does cable go?Yes
Riser diagramWhat connects to what, floor by floor, and with which cable?No
ScheduleFor each device: exactly which model, settings, cable and notes?It is a table
Detail drawingHow is this one thing mounted or wired? A typical door, a camera on a pole, the inside of a cabinet.Often
Cause and effect matrixWhen this happens, what follows? Lesson 5 covered it.It is a table

The floor plan is the architect's plan of each floor with your devices added as symbols. The riser diagram takes its name from the cables that rise through a building from floor to floor. It stacks the floors as boxes and draws lines between equipment, with no regard for real distances. A schedule, in drawing language, has nothing to do with dates. It is a table with one row per item. Access Control lesson 14 introduced the door schedule.

Every sheet carries a title block, usually along the bottom or right edge. It holds the project name, the sheet title and number, the scale, the date and the revision. On a plan, look for a north arrow too.

Say each thing once

This is the rule that keeps a drawing set honest. Each fact lives in one place, and the other documents point to it by the device's tag.

  • Position lives on the plan. The schedule may say "lobby", as a help to the reader, but the plan decides.
  • Connections live on the riser. Which cabinet a door reports to, and which switch a camera plugs into.
  • Details live in the schedule. Model, lock type, mounting height, lens, cable type.

The reason is practical. Designs change. If a camera's model is written beside its symbol on the plan, again on the riser and again in the schedule, then a change must be made three times, and one of them will be missed. The installer then finds two answers and has to guess, or stop and ask.

Check yourself

An installer needs to know which network switch camera C-07 plugs into. Where should they look first?

Tags, symbols and the legend

A tag is a device's unique name: D-101, C-07, ACP-1. It is the thread that ties the documents together, and it carries on into the cable labels and the software, as lesson 5 advised for names.

  • Make tags unique and never reuse one. If camera C-07 is deleted, the next new camera is not C-07.
  • Let the tag hint at the place. Many designers build the floor into the number, so that D-204 is a door on the second floor. Follow the project's convention if it has one.
  • Use the door numbers the architect already gave, where they exist. The lock supplier and the electrician are working from the same numbers.

Symbols vary from one design office to the next. A card reader may be a small square with "CR" in one set and a triangle in another. That is why the legend exists: a key on the cover sheet that shows every symbol and abbreviation used. Never assume a symbol. Read the legend of the set in your hand, and when you draw, put every symbol you use into yours.

On a plan, show which way a camera looks, with a small wedge for its field of view. A camera symbol with no direction leaves the most important decision to whoever is on the ladder.

Schedules

Most security designs need three schedules: doors, cameras and cables. Here is part of a camera schedule. Each column is a decision someone would otherwise have to make on site.

TagLocationPurposeMountHeightSwitch and portNotes
C-01LobbyRecognize faces at the front doorCeiling9 ftSW-1, port 3Facing the door, not the window
C-02Dock door 1Recognize faces, day and nightWall10 ftSW-1, port 4Needs added light, see lesson 3 list
C-03DrivewayRead license platesPole12 ftSW-2, port 1Outdoor rated, surge protection

Notice the "purpose" column. It carries the requirement from lesson 1 onto the drawing, so that the person aiming the camera knows what it is for.

A cable schedule lists every run: its own label, where it starts, where it ends, the cable type and the length you measured in lesson 2. Lesson 7, Device and cable counts, adds up these schedules to make the parts list.

Scale, and a check before you measure

A scale says how much real distance one inch of paper stands for. Floor plans in the United States are very often drawn at 1/8 inch to 1 foot, so one inch on paper is 8 feet of building. Larger buildings may use 1/16 inch to 1 foot, and details 1/4 inch or more.

A scale is true only if the sheet was printed at full size. A plan shrunk to fit letter paper, or dropped into an email, still says "1/8 in = 1 ft" in its title block and is no longer anything of the kind. Lesson 2 warned about this on site. The same check works at your desk: find something whose real size you know, such as a 3-foot door, and measure it on the print.

Measure from a printed plan

Enter what your ruler shows, in inches.

if the print were true to scale
size of this print compared with full size
real length of the route

Whatever the print says, a length taken from paper is an estimate. The length that goes in the cable schedule is the one you walked.

Revisions and record drawings

Drawings change many times between the first sketch and the last screw. Each issued version is a revision, marked with a letter or number in the title block and a dated line saying what changed. On the sheet, the changed area is commonly circled with a scalloped outline called a revision cloud, with the revision mark beside it.

  • One current set. When a new revision is issued, the old sheets are marked superseded or removed from the site.
  • Check the revision before you build. The first question on any drawing is "is this the latest?"
  • Mark up as you install. Keep one printed set on site and mark every difference in red: the camera moved four feet to miss a beam, the cable that took another route.
  • Hand over record drawings. At the end, the red marks are drawn up into a clean set that shows what was built, often called as-built or record drawings. The next technician, perhaps years later, will work from these.

Three examples

Simple: one sheet for a small shop

A shop needs two controlled doors and four cameras. A full drawing set would be out of proportion. The designer uses a single sheet: the floor plan with six tagged symbols on the left, a small riser of one cabinet and one recorder in a corner, and a six-row schedule down the right. A short legend sits above the title block.

It took two hours. The installer never phoned with a question, and the owner has a record of what is in the ceiling.

Medium: thirteen cameras, or twelve?

On a school project, a note on the plan reads "12 cameras, see schedule". The schedule has 13 rows, because a camera was added at the bike shed after the note was typed. The estimator priced 12 from the note. The installer mounted 13 from the schedule. The difference came out of somebody's margin.

The count had been stated twice, and only one copy was updated. The fix is the rule above: the plan shows symbols, the schedule has rows, and nobody types a total onto a drawing. If a total is wanted, it is counted from the schedule on the day it is needed.

Advanced: the wall that moved

During construction of an office, the architect moves a corridor wall by 6 feet and issues new plans. The security designer's drawings are still based on the old plan. Door D-214 now sits in a different wall, its reader would land on glass, and its cable is 20 feet longer.

The designer has a routine for this. Each architect's issue is compared with the last, and every security sheet that sits on a changed plan is reissued with a new revision, a cloud around D-214 and a line in the revision list. The door schedule and cable schedule change in the same issue, so the set never contradicts itself. The site foreman signs for the new sheets and returns the old ones. The alternative is discovered on installation day, with a hole already cut in the wrong wall.

From the field

  • Draw the riser early. It takes ten minutes and shows at once whether every device has a home and every cabinet has power and network.
  • Count symbols on the plan against rows in the schedule before every issue. They must match exactly.
  • Print a half-size set for the ladder and a full-size set for the wall, and never scale from the half-size one.
  • Put the cable label on the drawing. If the schedule says the run is "D-101", so does the tag on both ends of the cable.
  • Leave the record set in the equipment room, in a sleeve on the wall, with a copy in the customer's files.

Common mistakes

  • Writing the same detail on the plan, the riser and the schedule, then updating only one.
  • Reusing the tag of a deleted device.
  • Using symbols that are not in the legend.
  • Camera symbols with no direction of view.
  • Measuring cable from a print that was not checked against a known dimension.
  • Building from a superseded revision, and handing over no record drawings.

Summary

  • The plan says where, the riser says how things connect, and the schedule says exactly what.
  • State each fact once, and tie the documents together with unique tags.
  • Symbols differ between offices. The legend decides.
  • A scale is true only at full print size. Check it against something you know.
  • Track revisions, mark up changes as you build, and hand over record drawings.

Exercises

Answer each one yourself first, then open the answer.

Exercise 1. In the tool at the top, pick door D-102. Which cabinet does it connect to, with what cable, and how long is the run? Which document gave you each answer?

Show answer
It connects to ACP-1, which the riser shows. The cable is type A, door cable, shown on the riser and in the schedule. The run is 25 feet, from the schedule. The plan shows why it is short: the door is in the wall of the equipment room.

Exercise 2. A full-size plan is drawn at 1/8 inch to 1 foot. A corridor measures 11 inches on the paper. How long is the corridor?

Show answer
At that scale one inch is 8 feet, so 11 × 8 = 88 feet.

Exercise 3. On a print marked 1/8 inch to 1 foot, a door you know is 3 feet wide measures 0.3 inch. A cable route measures 7.5 inches. What is the real length of the route?

Show answer
At true scale the door would measure 3 ÷ 8 = 0.375 inch. It measures 0.3, so the print is 0.3 ÷ 0.375 = 80 percent of full size. The route would read 7.5 × 8 = 60 feet if the print were true, so the real length is 60 ÷ 0.8 = 75 feet. The calculator above starts with these numbers.

Exercise 4 (think, don't memorize). A colleague says, "Schedules are extra work. I just write the model number next to each symbol on the plan." Give two reasons to do it the other way.

Show answer
First, change. When a model or a setting changes, a schedule is edited in one row, while notes scattered over several plan sheets are easy to miss, and the set then contradicts itself. Second, use. A schedule can be counted, sorted and totaled to order parts, and used as a checklist for testing, row by row. A plan crowded with text is also harder to read for its real purpose, which is position. Your own reasons may differ. Any that come down to "one fact, one place" or "a table can be counted" are sound.