System Design and Integration, lesson 3 of 12
Requirements and priorities
Lesson 1 left you with a list of requirements, and lesson 2 told you what the building will allow. The list is almost always longer than the budget. This lesson shows how to rank requirements honestly, so that when something has to go, it is the right thing, and the customer chose it.
Fit the list to the budget
Pick a budget. Click a requirement, on the drawing or in the list below it, to change its priority and watch what gets built.
The everyday picture
You are packing for a week's trip with one carry-on bag. Passport, medication and a phone charger go in first, because the trip fails without them. Then the clothes you will wear most. Then, if there is room, a second pair of shoes and the book you might read.
Nobody packs the book first and hopes the passport fits. Yet security projects are often built that way: the item that excited the customer goes in first, and something dull and essential is squeezed out at the end.
Ranking requirements is packing the bag in the right order, and doing it out loud with the customer.
Must, should, could, won't
A widely used way to rank is four plain words. Some people call the method MoSCoW, after the first letters.
| Rank | Meaning | If it is left out | Example |
|---|---|---|---|
| Must | The system fails its purpose, or breaks a rule, without it. | Do not build. Raise the budget or rethink the project. | Every entry to the server room is logged by name. |
| Should | Important, and expected in a good job, but there is a tolerable way to cope without it for a while. | The system works. Someone does extra work or accepts a known gap. | License plates readable at the driveway. |
| Could | Welcome if it is cheap. Nobody is harmed by its absence. | Hardly noticed. | A large screen in the office showing all cameras. |
| Won't, this time | Discussed and deliberately left out of this project. | Nothing. It is written down so that nobody assumes it was included. | Readers on the upper-floor offices. |
The fourth row is the one people skip, and it prevents the most arguments. A written "not in this project" stops the customer from believing, six months later, that it was promised.
These ranks apply to requirements, not to products. "Cameras" is not a must. "Faces at the dock doors can be recognized" might be.
How to tell a must from a wish
Left alone, customers mark everything a must. The cure is to ask what happens without it. Three questions sort most requirements.
- Does a law, a code, an insurer or a contract demand it? Then it is a must, however dull. Read the wording yourself, as lesson 1 advised.
- Without it, is the main need from lesson 1 still met? If the need was "know who took a pallet" and this requirement is the only thing that shows faces at the dock, it is a must.
- Is there a tolerable workaround? A key and a sign-out sheet, a guard's patrol, a manual check each morning. If people could live with the workaround for a year, the requirement is a should.
Then ask one more question that is about cost, not rank: how hard is it to add later? A reader on one more door is easy to add next year if the cable is already there. A conduit under a parking lot is not, once the lot has been paved. This question does not change a should into a must. It decides what you prepare for now.
A useful check is the share of the budget taken by musts. If the musts use nearly all of it, there is no room for a surprise above a ceiling, and lesson 2 showed that surprises are normal. Many project teams aim to keep musts to around 60 percent of the effort. Treat that as a rule of thumb, not a law.
Check yourself
The fire marshal requires that a locked lobby door release when the fire alarm sounds. The customer says it is "nice to have". What is it?
Rank one requirement
Take any requirement from your own list and answer two questions about it.
What happens if it is left out?
How hard is it to add later?
When the musts do not fit
Set the tool at the top to $28,000 and you will see it: the musts alone cost more than the money. This is the most important moment in a project, and there are only four honest ways out.
| Way out | What it looks like | Watch for |
|---|---|---|
| Raise the budget | Show the customer exactly which must is unfunded and what it costs. | Ask early. Money is easier to find before a contract than after. |
| Challenge a must | Ask the three questions again. Sometimes a must is a should with a loud owner. | Never do this to a code or insurer requirement. |
| Meet the must a cheaper way | A requirement says what, not how. A door switch and a sounder may meet "know when the exit is opened" without a camera. | The requirement must still pass its handover test. |
| Shrink the scope | Protect one building properly, not three badly. | Write the other two under "won't, this time". |
There is a fifth way, and it is the wrong one: keep every item and thin each of them. Fewer days of recording than the requirement asks, cameras one grade too weak to show a face, no battery on the lock supply. The parts list looks complete and no requirement is actually met. A smaller system that does what it promises is better than a full one that does not.
Priorities belong to the customer. Your part is to cost each requirement, say what leaving it out would mean, and record the decision with a name and a date beside it.
Phases, and what to build in now
A should that misses this budget does not vanish. It moves to a later phase. Good phasing has two rules.
- Each phase works by itself. At the end of phase 1 the customer has a complete, tested system, not half of one waiting for money that may never come.
- Phase 1 carries the hidden parts of phase 2. While the ceiling is open, pull the cable for next year's reader and leave it coiled and labeled above the door. Choose a controller and a recorder with spare capacity. Leave an empty conduit where a trench is open.
The sums make the case. Pulling one extra cable while the crew is already in the ceiling might cost a hundred dollars in cable and half an hour of labor. Returning to an occupied, finished office to do it alone costs a visit, a ladder, dust sheets and half a day. Lesson 10, Designing for growth and failure, takes this further.
Three examples
Simple: the dental office
A dental practice lists four requirements and has $9,000. Locking the medicine cabinet room with a record of entries is a must, because the practice's rules for controlled drugs demand it. Staff entry by card at the back door is a should: keys work today. A camera in the waiting room is a could. A camera in the staff break room is a won't, by the owner's choice, and it is written down.
The must and the should cost $6,500 together. The could fits in the remainder. Nothing had to be argued, because each rank had a reason beside it.
Medium: everything is a must
A warehouse manager marks all eleven requirements as must. The total is $74,000 against a budget of $50,000. The designer does not argue. For each line she asks, "If this were missing on Monday, what would you do?"
For the dock cameras the answer is "we would be back where we started". That stays a must. For plate reading at the gate the answer is "the guard would keep writing them in the book". That is a workaround, so it is a should. After twenty minutes there are five musts at $33,000, four shoulds and two coulds. The musts and the two cheapest shoulds are built, and conduit for the gate camera goes in while the yard is being resurfaced.
Advanced: the must that could not be afforded
A school district has $120,000 for three schools. The one requirement nobody will give up is that visitors enter each school through a single controlled entrance during school hours. Costed properly, with doors that latch and an intercom at each office, that requirement alone comes to about $50,000 per school.
The tempting answer is $40,000 per school with weaker doors and no door switches on the side exits. The designer shows the board what that buys: three entrances that look controlled and are not, because any propped side door goes unnoticed. The board chooses to do two schools completely this year, starting with the two that have had incidents, and to put the third in next year's budget with its survey already done. The $20,000 left over pays for door repairs found in the survey and for the cable paths at the third school.
From the field
- Put a price beside every requirement before the ranking meeting. People rank very differently once they can see that the video wall costs as much as the stockroom door.
- Rank with all the stakeholders in one room, so that one person's must is heard by the others.
- Write the reason for each must in five words. "Insurer letter, clause on stock" is enough.
- Keep a contingency. Hold back a share of the budget, often around a tenth, for what the ceiling is hiding. Agree the figure with the customer.
- Revisit the list when anything changes. A new tenant next door or a new insurer can turn a could into a must.
Common mistakes
- Accepting "everything is a must" and then cutting quietly during design.
- Ranking by who asked loudest, or by what is most fun to install.
- Thinning every item to fit the money, so that nothing passes its test.
- Treating a code or life-safety requirement as open to negotiation.
- Leaving "won't" items unwritten, so that everyone remembers them differently.
- Phasing a project so that phase 1 is useless until phase 2 arrives.
Summary
- Rank requirements as must, should, could or won't this time.
- A must is something a rule demands, or without which the main need is not met.
- A tolerable workaround makes a requirement a should.
- If the musts exceed the budget, raise it, challenge a must, find a cheaper way to meet it, or shrink the scope. Do not thin everything.
- Phase the rest, and build the hidden parts of later phases while the ceiling is open.
Exercises
Answer each one yourself first, then open the answer. The tool at the top will help.
Exercise 1. In the tool at the top, leave the priorities as they start and choose the $45,000 budget. Which requirements are built, and how much is left?
Show answer
Exercise 2. With the $45,000 budget, change "Read plates at the driveway" from should to could. What happens, and why might that be a better plan?
Show answer
Exercise 3. A customer wants a reader on a conference room "eventually". The corridor ceiling is open for this project. What do you propose?
Show answer
Exercise 4 (think, don't memorize). Two managers disagree. One says cameras in the parking lot are a must because staff feel unsafe walking to their cars. The other says they are a could because nothing has ever happened there. How do you help them decide?