PanelSimulator Academy

Perimeter Protection, lesson 3 of 8

Gates and barriers

Every fence has to open somewhere, and the opening is where the fence is weakest and busiest. Access Control lesson 13 showed how a reader, a loop and a safety beam run a vehicle gate. This lesson is about the gate itself: which kind to choose, how much room it needs, how fast it moves and how it stays safe.

About 14 minutes. Read lesson 2 and Access Control lesson 13 first.

Four ways to close a road

Pick a kind of gate, then play or step through one car entering.

inside the site outside seen from above the leaves sweep this ground keep it flat and clear the open gate parks here: about 1.5 times the opening an arm stops cars only: people walk around it steel plate, raised built to stop a vehicle

The everyday picture

You already know three of these from home. A garden gate swings. A patio door slides. The arm at a railroad crossing lifts. Each suits its place: you would not hang a swinging door where it would hit the furniture, and you would not use a crossing arm to keep the dog in.

Vehicle gates are the same choices at a larger size. A gate leaf can weigh several hundred pounds, and a motor moves it without watching where it is going. So the choice is about space, speed and safety before it is about security.

The kinds, side by side

  • Swing gate. One or two leaves on hinges. Simple and cheap. Each leaf needs clear, level ground to sweep across, and wind on a wide leaf strains the hinges and the motor.
  • Slide gate. One panel that travels sideways along the fence. The usual form is the cantilever gate, which hangs from rollers on posts beside the opening and touches nothing in the road. To balance, it carries a tail about half as long as the opening.
  • Lift gates. A barrier arm pivots up at one end. A vertical lift gate rises straight up between two towers, and a vertical pivot gate tips up like a drawbridge. The last two are full security gates for places with no room to swing or slide.
  • Rising curb. A steel plate or wedge hinged in the road surface, also called a wedge barrier or road blocker. Rising bollards do the same job with posts. These exist to stop a vehicle that does not mean to stop.
SwingSlideBarrier armRising curb
Room it needsThe arc of each leafFence line beside the openingA small cabinet, and height for the raised armA pit in the road, with drainage
Time to openAbout 10 to 20 secondsAbout 1 foot a secondA few secondsA few seconds
Stops peopleYes, if as tall as the fenceYes, if as tall as the fenceNoNo
Stops a driven vehicleOnly if crash-ratedOnly if crash-ratedNo, unless crash-ratedYes, to its rating
Trouble comes fromWind, snow, slopesDebris and ice on a ground trackDrivers who follow too closelyWater, grit and neglect in the pit

Speeds vary by product, so take the real figure from the data sheet. The pattern holds: the gates that secure a site are slow, and the barriers that are fast do not secure it. Busy sites often use both, a barrier arm for the working day and a full gate that closes at night.

Check yourself

A 24-foot opening has a building wall 15 feet to one side and a loading area just inside. Which gate is hardest to fit?

The operator and its class

The motor and gearbox that move a gate are called the operator. In the United States, operators are built and listed to a safety standard, UL 325, which sorts them into four classes by where they will be used. The class tells you how hard a life the operator was built for and what protection it must have.

ClassMeant forTypical example
IHomes of one to four familiesA private driveway
IIPlaces the general public usesApartment complex, hotel, store parking
IIIIndustrial sites not open to the publicFactory, loading dock, truck yard
IVGuarded, restricted sitesAirport security gate, prison

Operators are also rated for how many times a day they can open and close. A driveway gate cycles ten times a day. The gate of a 300-unit apartment complex can cycle a thousand times. Put the first kind of operator on the second kind of site and it will be dead within the year.

Ask three more questions about any operator. What happens when the power fails: does it stay shut, open by itself, or run on a battery? How is it released by hand, and who holds the key? And how does the fire department get in? Access Control lesson 13 covered that last one.

A gate is a machine

People have been killed by automatic gates. Nearly always they were caught between the moving gate and something solid: a post, a wall, the ground. Each place where that can happen is called an entrapment zone.

  • Every entrapment zone needs protection, usually a light beam across the path, a pressure-sensing edge on the gate, or both. Current rules expect the operator to check that these devices are connected and working, and to refuse to run if they are not.
  • The gate must be built for automation. A companion standard, ASTM F2200, covers the gate itself: no gaps that a hand or foot can go through near where the gate passes a post, rollers guarded, and a gate that cannot fall over if it comes off its hardware.
  • People on foot get their own gate. A vehicle gate is not a pedestrian entrance. Provide a separate walk gate, placed so that nobody has a reason to step into the path of the moving gate.
  • Controls stay out of reach of the gate. Keypads and push buttons are set back several feet, so that nobody operates the gate while reaching through or standing against it.
  • Warning signs go on both sides, where drivers and walkers can read them.

These are safety rules, not security features, and they are not optional. If a customer asks you to remove a beam that causes nuisance stops, the answer is to find out why it trips.

Will it fit, and how long is the wait?

Two sums catch most gate mistakes before anything is ordered: the room the gate needs, and the time one car takes to get through.

Size a gate

Speeds are typical working figures. Use the data sheet for a real job.

to open
for one car, if the gate closes after each
cars a minute at that rate

The last figure is the one that surprises people. A full security gate that closes behind every vehicle passes only one or two cars a minute. If forty employees arrive between 7:50 and 8:00, the line reaches the street.

The gate as part of the fence

Lesson 2 named four routes past a barrier, and "around" usually means the gate. Hold the gate to the same standard as the fence beside it.

  • Same height, same topping. A 6-foot gate in an 8-foot fence sets the height of the whole perimeter at 6 feet.
  • Small gaps. Keep the gap under the gate and between the gate and its posts as small as the hardware allows.
  • Hardware that cannot be undone from outside. Hinges that cannot be lifted off, and a latch or lock that is shielded.
  • Closed means closed. A gate left open all day for convenience is a hole in the fence. If operations need it open, staff it or add a barrier arm and a camera.
  • One car per opening. A slow gate lets a second car follow the first. Where that matters, use two gates in a row with space for one vehicle between them, so that only one is open at a time. This is called a sally port.

Three examples

Simple: the storage lot

A self-storage lot has a 16-foot opening onto a short driveway, with a manual swing gate the manager is tired of opening. The driveway slopes up toward the lot, so an inward-swinging leaf would dig into the rising ground, and customers' cars wait right where the leaves would sweep.

There is 30 feet of straight fence beside the opening. A cantilever slide gate needs about 24 feet of it. It is the better fit, and nothing swings toward a waiting car.

Medium: the gate that wore out

A 250-unit apartment community fits the same operator the developer uses on single houses. It fails after seven months, is repaired, and fails again. Each time the gate is left open for weeks.

The operator was a class I unit built for a few cycles a day. This gate cycles 700 times. The replacement is a class II operator rated for continuous duty, with a battery so the gate still works in a power cut. The installer also checks that the gate rolls freely by hand, because a stiff gate would kill the new operator too.

Advanced: the truck line on the highway

A distribution center has a 30-foot slide gate with a reader. Each truck waits 30 seconds for the gate to open and the gate closes behind it. At shift change, trucks back up onto the state highway, and the police complain.

The sum explains it: 30 seconds to open, about 10 for a truck to pull through, 30 to close. That is 70 seconds a truck, less than one a minute. The fix keeps the slide gate for nights and weekends and adds barrier arms, a guard booth and a camera for the working day. The arms pass eight or more trucks a minute. Security in working hours now rests on the guard and the camera, which the customer accepts in writing.

From the field

  • Disconnect the operator and move the gate by hand. It should roll or swing easily and stay where you leave it. An operator is not a cure for a gate that binds.
  • Measure the room on site, not on the drawing. Look for utility boxes, trees and parked trailers where the gate will travel, and for wires or canopies above a barrier arm.
  • Test every safety device at handover and on a schedule. Break each beam and press each edge while the gate is moving. Write down the date.
  • Ask about snow and leaves. A gate with a ground track needs someone to keep it clear. A cantilever gate does not.
  • Count cycles for a day before choosing an operator. The customer's guess is usually low by half.

Common mistakes

  • Choosing a slide gate with no room for it to park, or a swing gate on a slope.
  • Fitting a residential operator on a busy commercial gate.
  • Expecting a barrier arm to secure a site.
  • No separate gate for people on foot, so they walk through the vehicle gate.
  • Bypassing a safety beam or edge to stop nuisance reversals.

Summary

  • Swing gates need an arc of clear ground. Slide gates need fence line beside the opening. Arms and rising curbs need little room.
  • Secure gates are slow and fast barriers are not secure. Busy sites combine them.
  • Match the operator's class and duty rating to the site.
  • An automatic gate is a machine that can hurt people. Protect every entrapment zone and give walkers their own gate.
  • The gate must match the fence in height, topping and gaps, and it must actually be closed.

Exercises

Answer each one yourself first, then open the answer.

Exercise 1. A cantilever slide gate covers a 20-foot opening. About how long is the whole gate, and how much clear fence line does it need beside the opening?

Show answer
The tail is about half the opening, so the gate is about 30 feet long. It needs about 30 feet of clear, straight fence line to park in. Check the maker's figure, because the tail length varies.

Exercise 2. That gate moves at 1 foot a second, and a car takes 5 seconds to drive through. How long is one full cycle, and how many cars pass in a minute if it closes after each?

Show answer
20 seconds to open, 5 to pass and 20 to close is 45 seconds. 60 divided by 45 is about 1.3 cars a minute.

Exercise 3. Which UL 325 class suits the gate of a shopping center parking garage, and why not class I?

Show answer
Class II, because the general public uses it. A class I operator is built for a private home and a few cycles a day, and would wear out quickly.

Exercise 4 (think, don't memorize). A school wants an automatic gate across its bus loop to stop parents driving in. The loop is also the route children walk from the buses to the door. What do you raise before choosing a gate?

Show answer
Safety before type. Children will be near a moving gate twice a day, so the first step is to move them away from it: a separate, fenced walkway and walk gate, with the vehicle gate where children have no reason to go. Then entrapment protection on every zone, and a rule that the gate stays open and still while buses load. Then the fire department's access. A barrier arm may be all that is needed, since the aim is to turn back parents' cars in daytime, not to secure the school at night.