Designing a system from a floor plan

You now know every part: credentials, readers, controllers, locks, doors, exits, power, cable, levels, events and software. This last lesson puts them together. You will design a small office, see the parts list build itself, and learn the order in which a professional works.

About 16 minutes. Read the rest of the course first.

Design this office

Click a numbered door to add or remove card access. The parts list and the review update as you go.

Server room Stockroom Reception Open office Stairs street yard cabinet
    controlled doors, each with a reader, lock, door switch and exit sensor
    four-door controllers
    smallest suitable power supply
    composite cable, with 10% spare

      The everyday picture

      A good tailor does not start by cutting cloth. They ask what the suit is for, take measurements, make a pattern, and only then cut. The cutting is the quick part.

      Access control design is the same. Choosing readers and locks is the quick part. The work that decides whether the system is any good happens before that: asking what is being protected, walking the building, and drawing lines on a plan.

      Ten steps from question to handover

      1. Ask what is being protected, and from whom. People, stock, data, equipment. A passing thief, a dishonest insider, an angry former employee. The answers decide how strong each door must be.
      2. Walk the site. Open and close every door. Look above ceilings. Note what each door and frame is made of, which hand it is, and where power and network are.
      3. Mark the layers on a plan. Public, staff and restricted. The next section explains this.
      4. Choose the doors. Every door where one layer meets the next is a candidate.
      5. Choose hardware for each door. Lock type, reader, door switch, exit device. Write it in a door schedule.
      6. Place controllers and power. In a locked room on the protected side, within cable reach of the doors.
      7. Plan cable routes and check the longest run for voltage drop.
      8. Take every door on an exit route to the authority having jurisdiction before ordering.
      9. Install, then test every door in every state: card in, exit, forced, held, power off, fire alarm, network off.
      10. Hand over. Train the people who will run it, and leave drawings, the door schedule, passwords and a backup.

      Think in layers

      Picture an onion. The outer skin is where anyone may be: the street, the parking lot, perhaps a reception area. Inside that is where staff may be. Deeper still are the few rooms that only some staff may enter.

      • Each step inward should pass a controlled door.
      • Sensitive rooms should sit deep, so that reaching them means passing two or three doors.
      • No shortcut should skip a layer. A stairwell, a freight elevator or a shared corridor often does.

      In the office above, the street is the outer layer, reception is semi-public, the open office is the staff layer, and the server room is restricted. Try removing door 2 and see what the review says.

      Check yourself

      Which comes first in a design?

      The door schedule

      The door schedule is the central document of any design. It has one row per door and one column per decision. Installers order from it, wire from it and test against it.

      DoorHandFrameLockWithout powerExit byCable run
      1 Front entrancePairGlass, no latchMagnetic lockUnlocksSensor and push button110 ft
      2 Reception to officeLHHollow steelElectric strikeStays lockedLever90 ft
      3 Server roomRHHollow steelElectric strikeStays lockedLever20 ft
      4 StockroomLHWoodElectric strikeStays lockedLever60 ft
      5 Rear exitRHRHollow steelNone. Door switch and sounder.Not applicablePush bar180 ft
      6 Stair doorLHRFire-rated steelFire-rated electrified lockUnlocks, stays latchedLever170 ft

      Every column is a lesson from this course. If you can fill in a row for a door and explain each entry, you can design that door.

      Two drawings go with it. A marked-up floor plan shows where each device and cable goes. A riser diagram shows, without scale, how cabinets, power supplies, network and doors connect.

      Three examples

      Simple: the office above

      With doors 1 to 4 controlled, the system is one four-door controller in the server room, a 4-amp supply with a battery, and about 310 feet of composite cable. The rear exit gets a door switch and a sounder so that propping is noticed. This is a complete, sound design for a small office.

      Medium: the shortcut through the stairs

      The same office is on the third floor of a shared building. The designer controls the front entrance and feels finished. But the stair door opens straight into the open office, and the stairs are shared with every other tenant.

      The stair door is where the public layer meets the staff layer, so it needs control. It is also a fire door on an exit route, which makes it the hardest door in the building: fire-rated hardware, free exit into the stairs, and a rule about unlocking on fire alarm. It was found by walking the site, not by looking at the front door.

      Advanced: designing for the day it grows

      A company expects to take the floor above within two years. The designer chooses an eight-door controller in place of a four, a supply with spare outputs, software licensed for more doors than today's, and an empty conduit to the ceiling of the floor above.

      The extra cost today is modest. Without it, the expansion would mean a second cabinet, a second supply, and a week of work in ceilings that are now finished and occupied.

      From the field

      • Ask "how do people really use this door?" at every door. The answer changes more designs than any catalog.
      • Number doors the same way on the plan, the schedule, the cable labels and the software.
      • Show the customer the layers on the plan and get agreement before choosing hardware.
      • Price the things nobody sees: cable, firestopping, door repairs, the elevator company, the fire alarm link.
      • Leave a record set on site: drawings as built, door schedule, test results, and where the backup is kept.

      Common mistakes

      • Starting from a product list and fitting the building to it.
      • Controlling the front door and leaving a side route open.
      • Putting a reader on every door, so that staff start propping them.
      • Leaving exit-route doors to be "sorted out on site".
      • Filling every port and every amp on day one.

      Summary

      • Design starts with what is being protected and a walk round the building.
      • Divide the plan into layers, and control the doors where layers meet.
      • The door schedule records every decision for every door.
      • Settle exit-route doors with the authority before ordering.
      • Leave room to grow, test every door in every state, and hand over records.

      Exercises

      Answer each one yourself first, then open the answer. The plan at the top will help.

      Exercise 1. In the plan, switch on all six doors. How many controllers are needed, and how many spare ports are left?

      Show answer
      Two four-door controllers, with two spare ports. Six doors do not fit on one.

      Exercise 2. Switch off door 2 and leave door 1 on. What does a visitor who has been let in at the front now have access to?

      Show answer
      The open office, and from there the doors of the stockroom and server room. Reception was meant to be the place where visitors wait. Without door 2 there is no line between visitors and staff.

      Exercise 3. Fill in a door schedule row for a new door: a wooden door with a latch from the open office into a manager's office, 75 feet from the cabinet, hinges on the left seen from the open office, swinging into the manager's office.

      Show answer
      Hand: LH. Frame: wood. Lock: fail-secure electric strike. Without power: stays locked. Exit by: lever. Cable run: 75 feet. It also needs a reader on the open-office side, a door switch and an exit sensor.

      Exercise 4 (think, don't memorize). The customer's budget covers four controlled doors, and you believe the office needs five. What do you do?

      Show answer
      Show the customer the layers on the plan and what the missing door leaves open. Then offer choices: a cheaper measure at the fifth door, such as a door switch and sounder or a mechanical lock with few keys; moving something sensitive so that four doors are enough; or installing the cable and a controller port for the fifth door now, so that adding it later is cheap. The decision is the customer's. Your job is to make sure they are choosing with the gap in plain view.

      After this course

      You have finished Access Control. The same way of thinking carries into the other courses: Video Surveillance shows you how to see what happens at these doors, Intrusion Detection covers the hours when nobody should be inside at all, and Doors and Locking Hardware goes deeper into the mechanical side.